2025-04-23
Project Overview
Project Name | AVIC Industrial Park Project |
Project Location | West side area of Longmen Highway Passenger Transport Center |
Waterproof Part | Roof |
Waterproof Material | TPO Waterproof Membrane |
Waterproof Area | 13000 square meters |
Due to the metal sheet structure of the factory roof, TPO waterproofing membrane is widely used on the roof to reflect most of the sunlight, effectively reducing heat transfer on the roof. Compared with the traditional pressed steel sheet composite insulation self waterproofing system, the waterproofing effect is more prominent and suitable for roof enclosure of large-span buildings.
Haobang professional team achieves high-quality engineering
Haobang Waterproof Co., Ltd., as one of the few production technology-based enterprises focusing on polymer flexible waterproof coiled materials in China, has overcome various construction difficulties and made great efforts to achieve the ultimate roof waterproof works of the project. The selected thermoplastic polyolefin TPO waterproof coiled materials have cold and heat resistance and aging resistance, effectively extending the service life of the project.
Construction of Haobang single-layer roof system
Key points of roof construction
Before construction, check the roof base to ensure that there are no obvious protrusions or depressions on the base. Remove debris
and foreign objects to ensure that the installed vapor barrier is not damaged, and also sweep away accumulated water and snow to
avoid potential moisture hazards in the roof system in the future.
Construction of gas barrier layer
According to the specifications, a vapor barrier layer should be laid on the surface of the base layer. The overlap width of the left and
right PE films should be 10 cm, and the overlap direction should be parallel to the water. Special butyl tape should be used for bonding
and sealing, and then the upper and lower PE films should be firmly bonded with a pressure roller.
Construction of insulation layer
When installing rock wool insulation boards, they should be laid with staggered joints in the top, bottom, left, and right directions, with
tight and smooth overlapping to prevent through seams. They should also be fixed with specialized fasteners to ensure that the
insulation board has sufficient load-bearing area and reduce damage to the insulation board. The installation and covering of rock
wool insulation board should be carried out simultaneously to prevent water and moisture.
Waterproof layer construction
Step 1 Roll material laying: First, pre lay the naturally relaxed TPO waterproof roll material on the base layer according to the contour line, flat and straight, without distortion, and cut it appropriately. The laying direction of the coil should be perpendicular to the long side direction of the profiled steel plate; The overlapping joints parallel to the ridge should be overlapped in the direction of water flow, and the overlapping joints perpendicular to the ridge should be overlapped in the direction of the maximum annual frequency wind direction.
Step 2 Roll overlap: The longitudinal overlap width of the roll should be ≥ 120 mm, and point or line fixation can be carried out according to the situation. Point fixing: According to the design spacing, use a special tool to screw the fixing part into the peak of the profiled steel plate, penetrating the steel plate by 25 mm; Line fixing arranges the metal pressure strips reasonably, and uses an electric screwdriver to directly screw the fixing parts into the peak of the profiled steel plate, penetrating the steel plate by 25 mm.
Step 3 Coiled material welding: All overlaps of the coiled material are welded using hot air welding. Clean the welding area before welding, free of water spots, oil stains, and attachments; Test the welding temperature, welding machine speed, and blowing volume during welding, and inspect the quality of the weld seam after welding. The rolls laid on the same day should be welded as much as possible on the same day; For the interfaces left after daily construction, they should be protected from rain and moisture.
Haobang Waterproofing Co., Ltd. participated in the construction of the roof of a certain aviation industrial park of AVIC, which adopts the TPO single-layer roof system. In the design and construction of the roof system, various factors were fully considered, the construction process was standardized, and the detailed nodes and construction difficulties were flexibly handled, creating a flawless and high-quality project. It has been 3 years since the completion of the project, and the waterproofing and insulation effects are good. It has won the silver award of the "2020 Building Waterproofing Industry Science and Technology Award - Engineering Technology Award (Jinyu Award)".
Contact Us at Any Time