2025-04-24
Project Introduction
Ningbo Rail Transit Line 3 is the third line of Ningbo Rail Transit and one of the main lines. The total length is 25.86 kilometers. The line runs from south to north, passing through Yinzhou, Jiangdong, Jiangbei, and Zhenhai districts, connecting the core area of Sanjiangkou and the two new urban areas of Ningbo (Zhenhai New City and Yinzhou Central District), and connecting with the Ningbo Fenghua intercity railway for operation.
Main materials
HDPE Waterproofing Membrane
Waterproof of rail transit
Waterproofing of subways has always been a key focus in subway construction. Due to the damage caused by water seepage to concrete structures, the service life of subway projects in China often fails to meet design expectations. At the same time, during the operation period of the subway, the water seepage problem seriously affects the traffic safety of the subway, and the leakage problem of the subway station also often becomes a hot topic in a city.
Haobang Waterproof Urban Subway System Solution, targeting the pre laid anti adhesive waterproof system used in subway engineering, solves the problem of high leakage rate in traditional waterproofing methods.
Contact Us at Any Time